Quick Answer: House demolition in Melbourne typically costs between $12,000 and $40,000+ for a full residential demolition in 2026, depending on property size, site access, material type, and whether asbestos is present. A standard 3-bedroom weatherboard home in metropolitan Melbourne costs approximately $15,000–$22,000 all-in. Asbestos removal (non-friable Class B) adds $2,000–$8,000 to the project cost.
Table of Contents
- Melbourne Demolition Cost Table 2026
- What’s Included in a Demolition Quote?
- Asbestos Removal in Melbourne — What You Need to Know
- 7 Key Factors That Affect Demolition Costs
- Melbourne Council Demolition Permit Fees 2026
- How to Choose the Right Demolition Contractor
- Areas We Service Across Melbourne & Victoria
- Frequently Asked Questions
Melbourne Demolition Cost Table 2026
Below are typical 2026 market prices for residential demolition across Melbourne and Victoria. All prices are indicative — every project is unique and a site inspection is always recommended before quoting.
| Demolition Type | Property Description | Estimated Cost (AUD) |
|---|---|---|
| Full demolition — small | 2-bed weatherboard or brick veneer, ~100m² | $12,000 – $16,000 |
| Full demolition — medium | 3-bed home, ~150–200m² (most common) | $15,000 – $22,000 |
| Full demolition — large | 4–5 bed double-storey, 250–400m² | $22,000 – $40,000+ |
| Partial / internal strip-out | Kitchen, bathroom, fitout removal only | $3,000 – $12,000 |
| Garage demolition | Single or double garage (freestanding) | $2,500 – $6,000 |
| Pool demolition | In-ground concrete or fibreglass pool | $5,000 – $12,000 |
| Commercial demolition | Small commercial structure, Victoria | $20,000 – $80,000+ |
| Asbestos removal (Class B) | Non-friable, added to any demo scope | $2,000 – $8,000 |
Tip: Prices reflect current 2026 Melbourne market conditions including labour, machinery hire, council permit fees, and EPA-compliant disposal. Always request a fixed-price quote — not hourly — for demolition work to avoid cost blow-outs.
What’s Included in a Demolition Quote?
A reputable Melbourne demolition contractor will include the following in their scope of works. Ask your contractor to confirm each item is covered before you sign anything.
- Council permits — Melbourne councils require a demolition permit. Most licensed contractors handle the permit application on your behalf.
- Machine demolition — excavator and bobcat hire, operator costs, and site safety management.
- Waste removal — EPA-compliant disposal and recycling of concrete, timber, steel, and brick.
- Service disconnections — gas, electricity, and water isolation before demolition begins.
- Site hoarding and safety — temporary fencing, safety barriers, and dust suppression during works.
- Site leave clean — site left level and clear, ready for your builder or landscaper to begin.
Asbestos Removal in Melbourne — What You Need to Know
If your Melbourne home was built before 1990, there is a high likelihood it contains asbestos-containing materials (ACM). In homes built before 1986, asbestos was routinely used in roofing, eaves, wall linings, floor tiles, fencing, and pipe lagging. Even homes built up to 2003 may have isolated ACM.
We are licensed to remove non-friable (Class B) asbestos across all Melbourne suburbs and regional Victoria. This covers the most common type of asbestos found in residential properties — including fibro sheeting, super-six roofing, Villaboard, compressed cement sheets, and floor tiles bonded with asbestos.
Class B (non-friable) asbestos removal: $45–$120 per m² depending on area, bonding type and disposal requirements. A full residential asbestos removal typically costs $2,000–$8,000. All work is carried out under strict WorkSafe Victoria and EPA guidelines with full documentation provided.
Asbestos Removal Cost Breakdown — Melbourne 2026
| Asbestos Item | Common Location | Removal Cost (AUD) |
|---|---|---|
| Fibro sheeting / wall lining | External walls, eaves, garages | $50–$90 per m² |
| Super-six corrugated roofing | Garages, outbuildings, carports | $55–$100 per m² |
| Vinyl floor tiles (bonded) | Kitchens, bathrooms, laundries | $45–$80 per m² |
| Asbestos fence panels | Side and rear boundaries | $80–$120 per m² |
| Full residential ACM removal | Whole-house (Class B scope) | $2,000 – $8,000+ |
How to Identify Asbestos in a Melbourne Home
The only way to confirm whether a material contains asbestos is through laboratory testing by an accredited assessor. However, the following materials in pre-1990 Melbourne homes are commonly asbestos-containing and should always be treated as suspect until tested:
- Flat or corrugated cement sheeting on eaves, soffits, and external walls
- Corrugated roofing on garages and outbuildings (super-six)
- Flexible compressed cement sheet (Villaboard, Hardiflex)
- Vinyl floor tiles, especially in kitchens and bathrooms installed pre-1980
- Textured paint or “popcorn” ceilings in homes built before 1985
- Insulation lagging on pipes in older Melbourne homes
Do not disturb suspected ACM. Contact a licensed asbestos assessor or our team for a professional inspection before any demolition or renovation work begins.
7 Key Factors That Affect Demolition Costs in Melbourne
No two demolition projects are the same. Here are the biggest cost drivers to understand before requesting quotes:
1. Property Size and Structure Type
A large double-storey brick home costs significantly more to demolish than a small single-storey weatherboard. Brick and concrete are denser, slower to demolish, and heavier to dispose of than timber-framed structures. As a general rule:
- Weatherboard / timber-framed homes are the most affordable to demolish
- Brick veneer homes sit in the mid range
- Double-brick and concrete structures are the most expensive per m²
2. Presence of Asbestos
Pre-1990 Melbourne homes almost always contain ACM. An asbestos survey before demolition is strongly recommended — unexpected asbestos discovery mid-job will increase costs and delay your project timeline. Budget a contingency of $2,000–$5,000 if your home is pre-1990 and has not been previously surveyed.
3. Site Access and Location
Poor site access — narrow streets, overhanging trees, adjoining fences, or neighbouring structures — restricts machinery and slows the job. Tight inner-city Melbourne blocks in suburbs such as Fitzroy, Northcote, Brunswick, or South Yarra often carry a site-access premium of $1,000–$3,000 compared to outer-suburban or regional sites.
4. Council Permit and Planning Requirements
Different Melbourne councils have different demolition permit fees. Heritage overlays or vegetation overlays can add complexity and cost. Inner-city councils (City of Melbourne, Yarra, Stonnington) tend to have more stringent requirements and longer permit processing times.
5. Tree Removal and Vegetation
If trees need to be removed prior to demolition, this is usually a separate cost item. Significant trees in Melbourne often require a separate council tree permit under the relevant local planning scheme, adding cost and time to the project.
6. Salvage and Recycling Potential
Older Melbourne homes may contain valuable materials — hardwood timber floors, heritage bricks, slate roofing, leadlight windows — that can be salvaged prior to demolition and either kept by the owner or sold to reclaim dealers. Successful salvage can reduce your net demolition cost by $1,000–$5,000 on the right property.
7. Urgency and Timeline
Fast-tracked demolitions requiring weekend or after-hours work will attract a premium. Planning your demolition with a 4–6 week lead time typically secures the best pricing and avoids availability surcharges.
Melbourne Council Demolition Permit Fees 2026
A demolition permit is required for the removal of any habitable structure in Victoria under the Building Act 1993. Permit fees vary by council and project value but generally range from $600 to $2,500+. Your demolition contractor should handle the permit application on your behalf as part of the project.
| Council | Typical Permit Processing Time | Notes |
|---|---|---|
| City of Melbourne | 2–4 weeks | Heritage overlays common |
| Yarra City Council | 3–6 weeks | Strong heritage overlay controls |
| Boroondara City Council | 2–4 weeks | Heritage overlays in Kew, Hawthorn |
| Port Phillip City Council | 2–4 weeks | Beachside and inner-city restrictions |
| Monash City Council | 1–3 weeks | Standard suburban permit process |
| Outer suburban councils | 1–3 weeks | Generally streamlined permit process |
Note: Properties subject to a Heritage Overlay (HO) may require an additional heritage planning permit from the council, which can extend project timelines by 4–12 weeks and may restrict the scope of demolition permitted.
How to Choose the Right Demolition Contractor in Melbourne
The cheapest quote is rarely the best choice when it comes to demolition. Here’s what to look for when comparing Melbourne contractors:
Check Their Victorian Building Authority (VBA) Registration
All demolition contractors in Victoria must be registered with the VBA. You can verify registration on the VBA public register. Never engage an unregistered contractor — you may be personally liable for non-compliant works.
Confirm Public Liability Insurance
Your contractor must carry a minimum of $20 million public liability coverage. Ask for the certificate of currency before works begin. Inadequate insurance exposes you to significant financial risk if something goes wrong on site.
Request a Detailed, Fixed-Price Quote
Avoid hourly rate arrangements. A professional contractor will provide a written scope of works with a fixed lump-sum price, a clear inclusions and exclusions list, and a project timeline.
Confirm Asbestos Licensing
If your property was built before 1990, ensure your contractor holds a current Class B asbestos removal licence issued under WorkSafe Victoria regulations. This licence must be current and displayed on request.
Check Google Reviews and Past Projects
Local Melbourne-based contractors with a strong review history on Google Maps and platforms like Hipages are generally a safer choice than low-cost operators without a verifiable track record. Ask for references from recent projects in your suburb.
Areas We Service Across Melbourne & Victoria
Our demolition and asbestos removal teams operate across metropolitan Melbourne and regional Victoria, including:
Inner Melbourne: Fitzroy, Collingwood, Richmond, South Yarra, St Kilda, Prahran, Northcote, Brunswick, Footscray, Williamstown
Eastern Suburbs: Box Hill, Doncaster, Ringwood, Mitcham, Croydon, Mooroolbark, Lilydale, Glen Waverley, Rowville, Dandenong
Southern Suburbs: Brighton, Bayside, Sandringham, Hampton, Mordialloc, Frankston, Mornington Peninsula, Cranbourne, Pakenham
Northern Suburbs: Epping, Craigieburn, Sunbury, Broadmeadows, Lalor, Thomastown, Reservoir
Western Suburbs: Werribee, Tarneit, Melton, Sunshine, Hoppers Crossing, Altona, Point Cook
Regional Victoria: Geelong, Bellarine Peninsula, Ballarat, Bendigo, Shepparton, Warrnambool
Don’t see your suburb? Contact us — we service all of Victoria.
Our Credentials
- ✅ Licensed and insured in Victoria (VBA registered)
- ✅ WorkSafe Victoria compliant
- ✅ EPA-approved waste disposal and recycling
- ✅ Class B (non-friable) asbestos removal licence
- ✅ Fixed-price contracts — no hidden costs
- ✅ Full documentation provided on completion
Frequently Asked Questions — Melbourne House Demolition 2026
How much does it cost to demolish a house in Melbourne in 2026?
A full residential demolition in Melbourne costs between $12,000 and $40,000+ depending on the size and construction type of the home. A standard 3-bedroom weatherboard house in metropolitan Melbourne typically costs $15,000–$22,000 including council permits, machine demolition, and waste removal. Larger double-storey homes, homes with asbestos, or properties with difficult site access will cost more.
Do I need a permit to demolish a house in Melbourne?
Yes. Under the Victorian Building Act 1993, a building permit is required for the demolition of any habitable structure. Your demolition contractor will typically organise this on your behalf. Permit fees range from $600 to $2,500 depending on your local council and the scale of the works. Heritage-listed properties or properties with a Heritage Overlay may require an additional planning permit.
How long does house demolition take in Melbourne?
A standard residential demolition (single-storey, 3-bedroom) typically takes 2–5 days of active demolition work. Add 3–6 weeks for the council permit application before works can begin. Larger double-storey homes or those with significant asbestos may take 1–2 weeks on site. Total project timeline from quote to cleared site is typically 6–10 weeks.
Does my Melbourne home have asbestos?
If your home was built before 1990, there is a strong likelihood it contains asbestos-containing materials. The most common locations are eaves, wall linings, roofing, fencing, floor tiles, and wet areas. A professional asbestos inspection and report is strongly recommended prior to any demolition. We can arrange this as part of your project scoping.
What is the difference between Class A and Class B asbestos removal?
Class A (friable) asbestos involves loose, powdery asbestos fibres and requires a highly restricted licence. Class B (non-friable) asbestos covers bonded asbestos — the most common type in Melbourne homes, where asbestos fibres are bound within another material such as cement sheeting, vinyl tiles or eave linings. We are licensed for Class B (non-friable) asbestos removal across all of Melbourne and Victoria.
Can you demolish just part of a house (partial demolition)?
Yes. Partial or selective demolition is common for renovation projects across Melbourne. This includes internal strip-outs, removing a rear extension, demolishing an outbuilding while retaining the main house, or removing a garage or carport. Prices for partial demolition typically start from $3,000 and vary based on complexity and site access.
How do I get an accurate demolition quote in Melbourne?
The most accurate way to get a demolition quote is through a free on-site inspection. A licensed demolition contractor will assess your property, identify any hazardous materials, review site access and council requirements, and provide you with a written fixed-price quote. We offer free, no-obligation site inspections across all Melbourne suburbs and Victoria.
Is demolition waste recycled in Melbourne?
Yes. Melbourne demolition contractors are required to sort and recycle demolition materials where possible in line with EPA Victoria guidelines. Concrete, bricks, steel, and timber are typically crushed, processed, and recycled. Asbestos-containing materials are disposed of at EPA-licensed landfill sites, with full tipping dockets and documentation provided to the client on completion.
What should I do before a demolition contractor arrives on site?
Before your demolition team arrives, you should: remove all personal belongings and valuables from the property; arrange for Australia Post to redirect mail; notify your neighbours in advance; confirm that electricity, gas, and water have been disconnected (your contractor will coordinate this); and ensure the site is accessible with any gates unlocked or removed if needed.
How much does asbestos removal cost in Melbourne?
Asbestos removal (Class B / non-friable) in Melbourne typically costs between $45 and $120 per m² depending on the material type and removal complexity. A full residential asbestos removal scope for a pre-1990 home costs approximately $2,000–$8,000. Individual items such as a fibro garage or asbestos fence may cost $1,500–$3,500 depending on area.
Ready to Get a Quote? Contact Melbourne’s Trusted Demolition Specialists
Whether you’re planning a knockdown-rebuild, a townhouse development, a renovation that requires selective demolition, or you’ve just discovered asbestos on your property — we can help.
We provide:
- Free on-site inspections across all Melbourne suburbs and Victoria
- Fixed-price written quotes with no hidden costs
- Licensed and insured demolition and Class B asbestos removal
- Fast turnaround from quote to permit to cleared site
Call us today for a free, no-obligation quote or site inspection. Melbourne’s licensed demolition team is ready to help you get your project moving.

Gone and Clean Demolition – Contact
📞 Call us: 0475 143 106
📧 Email: goneandcleandemolition@gmail.com
🌐 Contact Us: Gone and Clean Demolition – Contact
This guide was written by our licensed demolition specialists and reflects current 2026 Melbourne market conditions. Prices are indicative only — all projects vary. Contact us for a fixed-price quote based on your specific property.