On the day a Melbourne home or warehouse comes down, a procession of trucks rolls in and out of the site for hours. Tippers, scrap lorries, sealed asbestos vehicles, the occasional hook-lift bin. By sundown, the building you’ve known for decades — or that your tenants just moved out of — has been reduced to a graded patch of dirt.

So where did it all actually go?

It’s a question we get on almost every quote: from homeowners knocking down a 1960s brick veneer in Reservoir, from small developers clearing a battle-axe block in Bentleigh East, from CBD tenants stripping out an old fitout on Collins Street, from regional clients clearing a bushfire-damaged property in the Yarra Ranges. People want to know — and increasingly, their builders, their banks, their insurers and their procurement teams want to know in writing — exactly which truck went where, and what document proves it.

This guide is the honest, plain-English answer. We’re a licensed Melbourne demolition company with Class B (non-friable) asbestos removal capability held in-house, and we operate under EPA Victoria’s 2026 framework on every job we run. Here’s the truck-by-truck story of where Melbourne’s demolition waste really ends up.

Quick answer: On a properly run Melbourne demolition in 2026, roughly 85% of the material leaving site by weight is diverted away from landfill — concrete and brick go to EPA-licensed crushing facilities to become Recycled Concrete Aggregate (RCA) for roads and driveways, steel goes to scrap recovery for re-melting in electric arc furnaces, clean timber goes to reuse or mulching, salvaged fixtures go to second-hand markets, and plasterboard goes to dedicated gypsum recycling where viable. The remaining 15% of unrecoverable mixed waste goes to EPA-authorised landfill at the 2025–26 metropolitan waste levy of $167.90 per tonne. Asbestos can’t be recycled — it goes to a specifically licensed EPA-authorised asbestos cell under Waste Tracker through an A10a or A10b permitted transporter. Contaminated soil follows a similar tracked pathway. Every movement leaves a weighbridge docket and an audit trail.


Key Takeaways — Where Melbourne’s Demolition Waste Goes in 60 Seconds

  • Concrete and brick (60–80% of total tonnage) → crushed at EPA-licensed resource recovery facilities → reborn as Recycled Concrete Aggregate (RCA) for road sub-base, driveways, retaining walls and civil fill.
  • Steel and metals (5–10%) → segregated on site → sold to scrap recovery operators → re-melted in Australian electric arc furnaces. This stream pays you, not the landfill.
  • Timber (3–8%) → heritage and structural hardwoods to reclaimed timber yards; framing and clean pine to mulching, biomass or second-hand timber sales; CCA-treated pine to authorised facilities as priority waste.
  • Plasterboard, copper, aluminium, brass, fixtures (combined 3–10%) → recovered at the soft strip stage → gypsum recycling, scrap markets, salvage yards, online reuse marketplaces.
  • Asbestos (variable) → sealed, tracked through EPA Waste Tracker, transported by an A10a or A10b permission holderEPA-licensed asbestos cell. It can never be recycled.
  • Contaminated soil (especially from old industrial sites, former service stations, fire-damaged properties) → tested, classified, tracked → authorised treatment or landfill facility.
  • Genuinely unrecoverable mixed waste (8–15%)EPA-authorised landfill at $167.90 per tonne (metropolitan, 2025–26), with another rise indexed for 1 July 2026.
  • Every load is documented via weighbridge dockets, Waste Tracker entries and scrap receipts — retained for a minimum of 5 years.
  • Service area: residential, commercial, industrial and bushfire-damaged demolition across every metropolitan Melbourne council and regional Victoria.

Why “Where Does It Go?” Is the Most Important Question on Your Demolition Quote

Most homeowners and developers compare demolition quotes the same way they compare any service quote: total price first, brand recognition second. That misses the point.

In Victoria in 2026, the gap between a properly disposed-of load of demolition waste and an unlawfully disposed one is no longer a small ethical question — it’s a financial, legal and reputational chasm. Three forces have widened it:

1. The Waste Levy Has Made Disposal Genuinely Expensive

From 1 July 2025, the Victorian metropolitan municipal and industrial waste levy is $167.90 per tonne — up from $129.27 the previous year. That’s roughly a 28% jump in a single year, with another indexed rise scheduled for 1 July 2026 under the Environment Protection Act 2017‘s fee-unit system.

On a typical single-storey Melbourne house — say 100 tonnes of slab, brick, framing and fitout — sending everything to landfill would cost roughly $16,790 in levy alone, before tipping fees, transport or asbestos surcharges. On a 4,000-tonne tilt-panel warehouse demolition in Dandenong or Laverton, that bill stretches into the hundreds of thousands of dollars for the levy line item alone.

Cheap quotes don’t magically make levy disappear. They either reflect proper recycling (good), or they reflect a plan to dump somewhere unlawful (very bad — and the liability flows back to you as the waste producer).

2. EPA Victoria’s Enforcement Posture Is the Sharpest It’s Been in a Decade

EPA Victoria’s Illegal Waste Dumping Taskforce has been actively running snap inspections on skip bin operators, waste transporters and demolition contractors across Melbourne and regional Victoria. Recent enforcement activity includes a $10,000 fine for a Tarneit skip bin operator, multiple six-figure penalties for serial dumpers, and court action exceeding $1.6 million for prescribed industrial waste offences. Breaches of the General Environmental Duty (GED) can attract penalties up to roughly $1.8 million for companies per offence.

The maths is brutally simple: getting caught dumping now costs more than tipping legally. Every. Single. Time.

3. Your Builder, Bank and Insurer Increasingly Want Proof

Knockdown-rebuild clients, townhouse developers, commercial tenants on end-of-lease make-goods, retail rollouts and government-funded projects increasingly require landfill diversion reporting as part of the project documentation. Green Star ratings, NCC Section J compliance, ESG reporting and corporate sustainability disclosures all flow back to the demolition contractor’s recycling metrics — backed by weighbridge dockets and Waste Tracker records.

A demolition quote that can’t tell you where the waste is going isn’t a cheaper quote. It’s an uninsured one.

The full waste-side framework sits in our EPA Victoria Construction and Demolition Waste Rules 2026: A Plain-English Guide, and the economics behind eco-friendly methodology is in our Eco-Friendly Demolition Melbourne: How We Recycle 85% of Site Materials.


The Anatomy of a Typical Melbourne Demolition Load

Before we follow the trucks, it helps to know what they’re carrying. By weight, an average single-storey Melbourne home produces 80–150 tonnes of demolition material. A double-storey can push that to 150–250 tonnes. A standard 1,000–3,000 m² tilt-panel warehouse produces 1,500–4,000+ tonnes. Across all of those project types, the proportional mix is broadly similar:

Material streamTypical % of total weightWhere it ends up
Clean concrete (slab, footings, paths)35–50%EPA-licensed crushing facility → Recycled Concrete Aggregate (RCA)
Brick and masonry15–25%Crushing facility → RCA, or reclaimed brick market
Steel (roof, rebar, plumbing, structural)5–10%Scrap recovery operator → electric arc furnace re-melt
Clean timber (framing, flooring, structural)3–8%Reclaimed timber yard, mulching, or biomass feedstock
Salvage items (fittings, fixtures, heritage)1–5%Resale, reuse, second-hand market
Plasterboard2–4%Dedicated gypsum recycling where viable
Copper, aluminium, brass, cast iron<1–2%Specialist scrap recovery
Mixed/unrecoverable waste8–15%EPA-authorised general landfill
Asbestos waste (where present)Highly variableEPA-licensed asbestos cell — never recyclable
Contaminated soil (where present)Highly variableAuthorised treatment or RPW landfill, Waste Tracker logged

That 85% diversion figure is the clean construction and demolition waste moved away from landfill. It deliberately excludes asbestos, which is non-negotiable as a landfill stream regardless of how cleverly a project is run.

Let’s follow each truck.


Truck 1: The Concrete and Brick Tipper — Bound for the Crusher

This is the workhorse of any Melbourne demolition. A 5–13 tonne excavator with a hydraulic hammer, pulveriser or shear breaks out the slab, footings and external walls. The rebar gets magnetically separated as the concrete fractures. Clean concrete and brick are stockpiled separately, then loaded onto bulk tippers.

The Destination

Across our project footprint we work with a network of EPA-licensed resource recovery facilities spread through every quadrant of metropolitan Melbourne:

  • Western recyclers servicing growth-corridor jobs in Werribee, Point Cook, Tarneit, Truganina, Hoppers Crossing, Laverton and Melton
  • Southern facilities taking volume from Dandenong, Cranbourne, Pakenham, Officer, Clayton and the Mornington Peninsula
  • Northern processors handling Craigieburn, Mickleham, Donnybrook, Wollert, Mernda, Epping and Broadmeadows
  • Inner-suburban recyclers taking the Fitzroy, Carlton, Richmond, Brunswick, Footscray, Yarraville and CBD jobs
  • Regional plants servicing Geelong, Ballarat, Bendigo, the Yarra Ranges and the Macedon Ranges

At the facility, the concrete and brick is fed through a primary jaw crusher, then a secondary cone or impact crusher, then screened into size grades — usually 20mm minus, 40mm minus, and oversize. Steel residue is magnetically picked out at each stage. The resulting product is Recycled Concrete Aggregate (RCA).

The Second Life

RCA goes straight back into Victoria’s civil and landscaping markets:

  • Road sub-base for council, VicRoads and private estate works
  • Driveway and car-park base under residential and commercial paving
  • Drainage layers behind retaining walls and around stormwater infrastructure
  • Compacted fill for new building pads and embankments
  • Partial aggregate replacement in non-structural concrete mixes

There’s a genuine chance the slab from your old home in Glen Waverley or Caulfield ends up forming the sub-base under a new road, a townhouse car park, or — on knockdown-rebuild jobs where the timing aligns — the driveway under your own new home. We cover that loop in our Knockdown Rebuild Melbourne: Complete Homeowner’s Guide.

The Financial Reality

At $167.90 a tonne to landfill, a 100-tonne concrete slab would cost roughly $16,790 to bury. Diverted to a crushing facility, the same material has a recovery value of $10–$15 per tonne — meaning it moves from being a ~$17,000 liability to potentially a small revenue line. That’s a swing of $18,000–$19,000 on a single residential job just on the concrete and brick stream.

On a 4,000-tonne industrial demolition, the swing can be $300,000–$500,000 depending on whether the contractor runs an on-site mobile crusher or trucks raw material off-site. We unpack that arithmetic in our Factory and Warehouse Demolition Victoria: What’s Different guide.


Truck 2: The Scrap Lorry — Loaded With Revenue, Not Waste

Steel doesn’t get paid to dispose of. It gets paid for. On every demolition we run, recoverable metals are segregated as the soft strip and mechanical demolition progress:

  • Reinforcement steel (rebar) from slabs and footings
  • Roof sheeting — Colorbond, galvanised steel, zincalume
  • Structural steel — beams, columns, lintels, RHS, portal frames on industrial jobs
  • Copper — water pipework, electrical cabling, hot water units
  • Aluminium — window frames, downpipes, gutters, flashing
  • Brass and bronze — door hardware, plumbing fittings, heritage fixtures
  • Cast iron — drainage, decorative items, heritage fireplaces and surrounds

Each metal type is stockpiled separately and sold to scrap recovery operators at current spot prices by weight. On a typical Melbourne residential demolition, the metals recovery generally runs into the hundreds of dollars. On industrial demolitions with hundreds of tonnes of structural steel — a tilt-panel warehouse in Dandenong South, a manufacturing facility in Campbellfield, a logistics shed in Truganina — the recovery value reaches tens to hundreds of thousands of dollars against the project.

The Carbon Story

Scrap-recovered steel goes back into Australian steelmaking via electric arc furnaces — a far lower-carbon process than primary blast-furnace steel production. The embodied carbon avoided is significant: roughly 1.5–2 tonnes CO₂-e saved per tonne of recovered steel. On an industrial job that recovers 200–400 tonnes of structural steel, that’s hundreds of tonnes of CO₂-e off your project’s footprint — the kind of number that lands neatly in a builder’s ESG report.


Truck 3: The Timber Run — Salvage First, Mulch Second

Timber recovery depends heavily on the era of the building.

Pre-1940s Heritage Stock

The brick-and-timber heritage stock across Fitzroy, Carlton, Collingwood, Richmond, South Melbourne, Albert Park, Williamstown and Brunswick was built with hardwood structural timbers — Victorian ash, blue gum, ironbark, messmate — that are now functionally irreplaceable. These do not get crushed in the slab. They get pulled out cleanly in the soft strip stage.

On a heritage soft strip we routinely recover:

  • Hardwood floorboards ($50–$120/m² resale)
  • Weatherboards (cleaned, denailed, on-sold)
  • Structural beams, posts, joists
  • Architraves, skirting, picture rails
  • Doors, mantelpieces, fireplaces, leadlight windows
  • Reclaimed bricks (Melbourne’s reclaimed-brick market is strong)

These items go to specialist reclaimed-timber yards across Melbourne and regional Victoria. Our Heritage House Renovations: When Partial Demolition Is Allowed in Melbourne guide covers the heritage sequencing in detail.

Post-War to 1990s Stock

The mid-century brick-veneer and weatherboard stock across Preston, Box Hill, Bentleigh, Cheltenham, Frankston, Sunshine and the older outer-suburban belts carries less salvage-grade timber, but still generates recoverable framing — pine, hardwood and treated pine — that goes to mulching, biomass feedstock, or second-hand timber yards.

The CCA-Treated Pine Trap

CCA-treated pine — the green-tinged pine used in decks, retaining walls, pergolas, fence posts and outdoor structures — is classified as priority waste under the Environment Protection Regulations 2021. It cannot go to general timber recycling, cannot be mulched for landscaping, and cannot be burned. It has to be separated on site and sent to an authorised facility. Cheap quotes that treat all timber as a single recycling stream miss this — and the duty-holder exposure flows back to the property owner.


Truck 4: The Soft-Strip Van — Fixtures, Fittings and the Salvage Premium

The soft strip is where the recycling percentage is genuinely made or lost. Pulling out fixtures, fittings, fixed plant and salvageable elements before the excavator arrives is the difference between a clean recycling stream and a mixed-rubble landfill consignment.

Soft strip items travel in a different kind of vehicle entirely — usually a tilt-tray, a panel van, or an enclosed trailer — and head to a much wider mix of destinations than the bulk waste streams:

  • Kitchen and bathroom fixtures — ovens, cooktops, sinks, taps, baths, vanities → resale yards, online marketplaces, scrap
  • Internal doors, hardware, architraves → second-hand building yards
  • Wall and floor tiles in good condition → reuse markets
  • Heritage fixtures — claw-foot baths, leadlight, fireplaces, mantelpieces, cornices → specialist resale (often $400–$2,000+ per item)
  • Carpets and floor coverings → limited recycling pathways for synthetic carpet
  • Light fittings, ceiling fans, electrical fixtures → scrap and resale
  • Cabinetry and joinery → sometimes reusable whole
  • HVAC and split systems → refrigerant degassed under licence by a licensed refrigerant handler, then scrapped
  • Hot water systems → scrap recovery
  • Solar panels and inverters → dedicated solar recycling pathway

A claw-foot bath that gets crushed in the slab is mixed waste at $167.90 a tonne. The same claw-foot bath pulled out cleanly in soft strip is a $400–$2,000 resale item. That’s the financial logic of the waste hierarchy in one sentence.

We cover the full method in Soft Strip vs Hard Demolition: Choosing the Right Method in Melbourne.


Truck 5: The Sealed Asbestos Vehicle — Bound for an EPA-Licensed Cell

This is the most highly regulated truck on any Melbourne demolition site, and the one that absolutely cannot be skipped, faked or sub-contracted to “a mate with a tipper”.

Why Asbestos Can’t Be Recycled

Asbestos is pre-classified as reportable priority waste (RPW) under Schedule 5 of the Environment Protection Regulations 2021. It must go to an EPA-licensed landfill cell specifically authorised to receive asbestos. It cannot be crushed, repurposed, mulched, composted, buried on private property, or mixed into any other waste stream — under any circumstances.

The reasoning is medical, not procedural. Asbestos fibres released into the air are linked to mesothelioma, asbestosis and asbestos-related lung cancer with latency periods measured in decades. Every shortcut taken with asbestos waste today becomes someone’s diagnosis in 2046.

How the Sealed-Vehicle Pathway Actually Works

A properly sequenced asbestos disposal looks like this on every Melbourne site we run:

  1. Hazardous materials survey by a competent person, identifying every ACM (asbestos-containing material) on site. The full picture of where it hides in Melbourne homes sits in our Asbestos in Melbourne Homes: How to Identify Before Demolition guide and the era-specific profile in Asbestos in 1950s–1980s Melbourne Homes: What’s Likely Hiding.
  2. WorkSafe Victoria notification lodged at least 5 days before Class B non-friable asbestos removal begins.
  3. Class B licensed asbestos removal under controlled conditions — wet methods, P2 respirators, Type 5/6 coveralls, sealed waste bagging, EPA Waste Tracker logged at every change of hands.
  4. Transport by an A10a or A10b permission holder — the only legal way to move asbestos waste on Victorian roads. The vehicle is sealed, signed, and the load is documented at pickup.
  5. Destination: EPA-licensed asbestos cell at a landfill specifically authorised to receive asbestos. The receiving facility weighs and logs the load against the Waste Tracker entry.
  6. Independent licensed assessor issues an asbestos clearance certificate for the cleared area before any further works begin.
  7. Then — and only then — does mechanical demolition begin on the rest of the building.

The mechanics of the friable vs non-friable distinction, and why getting that sequence right matters financially, sit in our Friable vs Non-Friable Asbestos in Melbourne Demolition guide. How to verify any contractor’s asbestos credentials is covered in Licensed Asbestos Removal Victoria: How to Verify Your Contractor.

The Knock-On to Everything Else

If non-friable asbestos is left in place and the building gets pushed over by an excavator, the material is mechanically damaged and becomes friable. The whole site — including the surrounding soil — becomes contaminated. The top 100 mm of soil has to be removed and managed as asbestos-contaminated reportable priority waste. None of the remaining concrete, brick, timber or steel can be recycled, because every stream is now classified as asbestos-impacted waste.

A demolition that should have hit 85% recycling collapses to roughly 0% diversion. The whole site ends up in an asbestos cell at premium rates. Class A friable clean-up costs 3–5× what a properly sequenced Class B job would have cost.

Skipping the proper asbestos sequence doesn’t just create a health and compliance disaster — it destroys the entire recycling outcome for the project.


Truck 6: The Soil Truck — Tested First, Tracked Second

Soil is often the forgotten waste stream on a Melbourne demolition. It shouldn’t be.

Any property with a contamination history — former service stations, dry cleaners, factories, market gardens, fire-damaged sites, filled land, anything pre-1990 with asbestos cement — should be treated as potentially contaminated until tested. The “clean fill” label is only clean if you can prove it with laboratory results.

On a typical Melbourne residential job in a low-risk area, surplus soil moves as general industrial waste to a fill receiving facility. On an inner-suburban site in Cremorne, Footscray, Brunswick East or Yarraville with industrial history, or on a former service-station block anywhere in metropolitan Melbourne, soil is tested before excavation and managed according to its classification:

  • General industrial soil → authorised fill receiving site
  • Priority waste soil → authorised treatment or landfill facility
  • Reportable priority waste soil (asbestos-contaminated, hydrocarbon-contaminated, lead-contaminated) → tracked through EPA Waste Tracker, transported by an A10a or A10b permission holder, sent to a facility specifically authorised to receive that contamination class

Moving “clean fill” that turns out to be contaminated is one of the most common ways small builders and owner-builders get caught by EPA Victoria. The duty exposure sits with the waste producer — which on most demolition sites includes the property owner.


Truck 7: The Last Tipper — Genuinely Unrecoverable Mixed Waste

After every other stream has been pulled out, what remains is the genuinely unrecoverable 8–15% — plastics, soft furnishings, insulation foams, contaminated plasterboard, mixed small materials. This is the only material that legitimately goes to EPA-authorised general landfill at the full metropolitan waste levy of $167.90 per tonne.

On a properly run quote, this should appear as a separate, modest line item — not as a catch-all “mixed waste tipping” charge that swallows the entire project. If a quote bundles the whole job into one big landfill number, the contractor is either overpaying levy on every tonne, or planning to tip somewhere unlawful. Both outcomes are bad for your wallet — and the second one is illegal.


The Paper Trail — How To Verify Where Your Demolition Waste Actually Went

If a Melbourne contractor tells you they recycle 85% of demolition material, ask one question: can you show me?

A genuine answer comes in the form of a documentation pack that includes:

  • Weighbridge dockets from every destination facility — concrete crusher, scrap yard, asbestos cell, mixed-waste landfill, soil facility. Each docket carries the date, weight, waste classification and receiver’s authorisation reference.
  • EPA Waste Tracker manifest summaries for every reportable priority waste movement — asbestos, contaminated soil, PCB-containing fluorescent ballasts, and any other RPW.
  • Scrap recovery receipts showing weights and metal types sold.
  • A10a or A10b transporter permission numbers for every RPW load.
  • Asbestos clearance certificate issued by an independent licensed assessor — separate from the removalist.
  • Pre-start waste plan referenced in the scope of works, showing the named destinations for each waste stream.
  • Diversion percentage calculation with the underlying weighbridge tonnages.

We retain this paperwork for a minimum of 5 years (we recommend 7) and hand a complete pack across to every client at project handover. Future buyers’ due diligence will look for it. So will banks, insurers, councils on subsequent permits, and any procurement function on a corporate or government client.


How to Spot a Quote That’s Quietly Planning to Dump Somewhere Unlawful

Cash-cheap demolition quotes don’t come from divine economic intervention. They come from one of three places: under-quoted scope (extras hit you later), under-staffed sites (safety incidents waiting to happen), or unlawful disposal somewhere down the line. The third one is where the duty-holder exposure flows back to you as the property owner under the Environment Protection Act 2017.

🚩 Red flags on a demolition quote:

  • A single mixed-waste tipping line for the entire job, with no breakdown of streams
  • “All waste to recycling” with no named destinations — meaningless on its own
  • No reference to EPA Waste Tracker, A10a/A10b, or the Environment Protection Act 2017
  • No asbestos clearance certificate scope or assessor named
  • No weighbridge docket or diversion reporting commitment
  • Total price that sits significantly below market with no methodology explanation
  • Contractor can’t name specific recycling facilities they send material to
  • Contractor refers you to a “skip bin operator” for waste, instead of managing it inside the demolition scope

Green flags on a properly scoped quote:

  • Separate line items for at least three waste streams — concrete and brick to crushing, steel to scrap, mixed waste to landfill, asbestos as its own line
  • Named recyclers, scrap operators and asbestos cells in the scope
  • EPA Waste Tracker reference for all RPW movements
  • A10a or A10b permission numbers for asbestos and other RPW transport
  • Weighbridge docket retention commitment (5 years minimum)
  • Pre-start waste plan referenced in the scope of works
  • Diversion percentage commitment — with weighbridge evidence on completion
  • Asbestos clearance certificate from an independent licensed assessor

The Carbon Story — Why Where Your Waste Goes Affects Your New Build’s Footprint

The embodied-carbon savings on a properly run Melbourne demolition are bigger than most homeowners realise:

  • Concrete to RCA instead of virgin aggregate — roughly 5–15 kg CO₂-e saved per tonne of aggregate replaced
  • Steel scrap to electric arc furnace instead of primary steel — roughly 1.5–2 tonnes CO₂-e saved per tonne of recovered steel
  • Reclaimed timber instead of new hardwood — roughly 0.7–1.5 tonnes CO₂-e saved per cubic metre
  • Avoided landfill methane emissions — variable but material

On a single residential knockdown rebuild, the embodied carbon avoided through 85% recycling is typically 10–25 tonnes CO₂-e — equivalent to taking a small passenger car off the road for 3–7 years. On a 4,000-tonne industrial demolition, the avoided footprint sits in the hundreds of tonnes of CO₂-e range. Increasingly, builders’ procurement teams ask for that number in writing for Green Star, NCC Section J and ESG reporting purposes — and the only way to get it is to know exactly where every truck went.


Gone and Clean Demolition - Logo

Gone and Clean Demolition – Contact

📞 Call us: 0475 143 106
📧 Email: goneandcleandemolition@gmail.com
🌐 Contact Us: Gone and Clean Demolition – Contact


Frequently Asked Questions — Where Melbourne’s Demolition Waste Goes

Where does concrete from a Melbourne demolition actually end up?

EPA-licensed crushing facilities across metropolitan Melbourne. The clean concrete is crushed, screened and reborn as Recycled Concrete Aggregate (RCA) — used for road sub-base, driveway base, retaining wall drainage, civil fill, and partial aggregate replacement in non-structural concrete. The slab from a knockdown in Glen Waverley or Caulfield routinely ends up under a new road, a townhouse car park or — where the timing aligns — the new driveway on the same site.

Where does asbestos waste from Melbourne homes go?

To an EPA-licensed landfill cell specifically authorised to receive asbestos. It cannot legally go anywhere else. The waste is sealed and bagged on site, tracked through EPA Waste Tracker at every change of hands, transported only by an A10a or A10b permission holder, and weighed and logged at the receiving facility. Asbestos is pre-classified as reportable priority waste under Schedule 5 of the Environment Protection Regulations 2021 — it cannot be crushed, recycled, mulched, composted or buried on private property under any circumstances.

What percentage of Melbourne demolition waste actually gets recycled?

Properly run Melbourne demolition contractors typically divert 80–90% of clean construction and demolition waste from landfill. Our standard target is 85% across residential, commercial and industrial projects. Heritage projects with significant salvage often exceed 90%. Bushfire-damaged sites with widespread asbestos contamination sit lower, because more material is unrecoverable — we cover that in our Bushfire-Damaged Property Demolition: The Victorian Process guide.

Can demolition rubble be buried on my own property in Victoria?

No. Burying construction and demolition waste on your property is a duty breach under the Environment Protection Act 2017 — even on your own land. Soil and rubble can only be deposited at a lawfully authorised place for that waste type. Buried rubble also surfaces as a contamination liability in future title searches, building permit applications and subdivision approvals.

How much does the Victorian waste levy cost in 2026?

For the financial year 1 July 2025 to 30 June 2026, the metropolitan municipal and industrial waste levy is $167.90 per tonne, up from $129.27 the previous year. Rural rates are $84.78 per tonne for municipal waste and $149.33 per tonne for industrial waste. Higher rates apply to certain priority waste categories. The levy is scheduled to rise again from 1 July 2026 under the indexed fee-unit system in the Environment Protection Act 2017.

What is EPA Waste Tracker and why does it appear on demolition quotes?

Waste Tracker is EPA Victoria’s digital system for tracking reportable priority waste from cradle to grave. Every movement of asbestos, contaminated soil and other RPW is logged in Waste Tracker by the producer, transporter and receiver. If your demolition produces any RPW (most do, because of asbestos), Waste Tracker is legally required — and the duty sits with the producer of the waste, which can include you as the property owner. A demolition quote that doesn’t reference Waste Tracker is operating outside the current EPA framework.

What happens to steel and metals from a Melbourne demolition?

They get sold to scrap recovery operators and re-melted in Australian electric arc furnaces. Steel doesn’t cost money to dispose of — it generates revenue against the project. Reinforcement bar, roof sheeting, structural steel, copper pipework, aluminium window frames, brass plumbing fittings and cast iron are all segregated separately on site and sold by weight. On industrial demolitions, the metals recovery can reach tens to hundreds of thousands of dollars and offsets a meaningful portion of the project cost.

Can the materials from my demolition be reused on my new build?

Yes — and increasingly clients ask for this. Recycled aggregate from your old slab can be used as sub-base under your new driveway, paths, retaining walls or compacted fill. Reclaimed bricks become a feature wall or paving. Salvaged hardwood floorboards can be re-laid in the new home. Heritage fireplaces, mantels and leadlight commonly migrate from the old building into the new design. Talk to your demolition contractor and your builder about salvage at the quote stage — soft strip is where these items survive or get crushed.

How do I verify a Melbourne demolition contractor is sending waste to the right places?

Ask for the documentation pack: weighbridge dockets from every destination, Waste Tracker manifest summaries for all RPW, scrap recovery receipts, A10a/A10b transporter permission numbers, the asbestos clearance certificate from an independent licensed assessor, and the pre-start waste plan with named destinations. A contractor who hesitates on any of these — or who can’t name the actual crushing facility, scrap yard or asbestos cell they use — is not operating under the current 2026 EPA framework.

What are the penalties for getting demolition waste disposal wrong in Victoria?

Penalties under the Environment Protection Act 2017 are substantial. Breaches of the General Environmental Duty can attract penalties up to roughly $907,200 for individuals and $1,814,400 for companies per offence, depending on the year’s fee-unit values. Illegal disposal of prescribed industrial waste can result in fines exceeding $1.6 million for companies plus potential criminal prosecution. Beyond fines, EPA can issue stop-work notices, recover clean-up costs and publicly name offenders. As the property owner and waste producer, you retain residual duty exposure even when you’ve engaged a contractor — choosing a properly licensed Melbourne demolition company is also choosing your own liability protection.

Does the recycling pathway change if my house was bushfire-damaged?

Yes — substantially. Fire damage degrades materials and routinely cross-contaminates the site with combustion residues, asbestos fibres released from burnt ACM, hydrocarbons, heavy metals and dioxins. Recycling rates on bushfire-damaged demolitions are typically much lower than standard, because more material ends up classified as contaminated waste. Our Bushfire-Damaged Property Demolition: The Victorian Process guide covers the methodology in detail.


Get a Properly Scoped Melbourne Demolition Quote — With the Paper Trail to Match

We’re a fully licensed Melbourne demolition company with Class B (non-friable) asbestos removal capability held in-house — meaning your hazardous materials survey, soft strip, salvage, asbestos removal, EPA Waste Tracker compliance, material segregation, weighbridge documentation and full landfill-diversion reporting are all delivered under one insured roof, across every metropolitan Melbourne council and regional Victorian centre.

We run eco-friendly demolition projects targeting 85%+ landfill diversion across:

  • Inner Melbourne: CBD, Carlton, Fitzroy, Collingwood, Richmond, South Yarra, St Kilda, Albert Park, Southbank, Docklands
  • Inner-east: Hawthorn, Kew, Camberwell, Balwyn, Malvern, Toorak, Brighton, Caulfield, Glen Iris, Armadale, Prahran
  • North: Brunswick, Coburg, Pascoe Vale, Essendon, Heidelberg, Ivanhoe, Northcote, Thornbury, Preston, Reservoir, Moonee Ponds
  • Inner-west: Footscray, Yarraville, Seddon, Williamstown, Maribyrnong, Sunshine
  • East and outer-east: Box Hill, Doncaster, Ringwood, Croydon, Lilydale, Belgrave, Mitcham, Glen Waverley, Mount Waverley, Blackburn
  • South-east: Bentleigh, Cheltenham, Mentone, Mordialloc, Frankston, Dandenong, Clayton, Springvale, Oakleigh
  • Mornington Peninsula: Mornington, Mt Eliza, Rosebud, Sorrento, Portsea, Rye, Dromana
  • Outer-west growth corridor: Werribee, Point Cook, Tarneit, Truganina, Hoppers Crossing, Melton, Caroline Springs, Wyndham Vale
  • Outer-south growth corridor: Berwick, Cranbourne, Narre Warren, Pakenham, Officer, Clyde North, Beaconsfield
  • Outer-north growth corridor: Craigieburn, Mickleham, Donnybrook, Wollert, Mernda, Doreen, Epping, Broadmeadows, Sunbury
  • Regional Victoria: Geelong, Ballarat, Bendigo, Yarra Ranges, Macedon Ranges, Bass Coast, Gippsland

Whether it’s a knockdown rebuild in Tarneit or Brighton, a heritage strip-out in Fitzroy or Williamstown, a townhouse demolition in Bentleigh East or Coburg, an end-of-lease commercial make-good in a Collins Street tower or Chadstone tenancy, a warehouse demolition in Dandenong South or Laverton North, a factory clearance for a rezoned industrial parcel in Brunswick East or Cremorne, or a bushfire-damaged property in the Yarra Ranges or Macedon Ranges — we’ll scope every waste stream properly, sequence the asbestos and recycling compliance correctly, and hand you a documentation pack that proves where every tonne went.

Call us today for a free site inspection and a fixed-price, fully itemised quote — with material recycling pathways, asbestos removal, EPA Waste Tracker compliance, weighbridge documentation and your projected landfill diversion percentage properly itemised, and every WorkSafe Victoria, EPA Victoria and council requirement covered from quote to clearance certificate.

When the last truck leaves your site, you’ll know exactly where every tonne ended up — and you’ll have the paperwork to prove it.


Disclaimer: This guide summarises the typical destinations of construction and demolition waste from metropolitan Melbourne and regional Victorian demolition projects as of May 2026 in plain English. It is not legal, planning, OHS, environmental or financial advice. Waste levy rates, EPA permissions, fee-unit values, recycling facility authorisations and asbestos disposal requirements change regularly — always check the current Environment Protection Act 2017, Environment Protection Regulations 2021, the WorkSafe Victoria Compliance Code: Demolition and Compliance Code: Removing Asbestos in Workplaces, current EPA Victoria guidance, or consult a qualified environmental professional, licensed asbestos assessor or licensed demolition contractor, before relying on this information for a specific project. Fee-unit values reset on 1 July each year.


Sources & Further Reading

  • Environment Protection Act 2017 (Vic)
  • Environment Protection Regulations 2021 (Vic), particularly Schedules 1 and 5
  • EPA Victoria — Civil Construction, Building and Demolition Guide (publication 1834)
  • EPA Victoria — Construction Industry hub: epa.vic.gov.au/construction-industry
  • EPA Victoria — Asbestos Waste: epa.vic.gov.au/asbestos-waste
  • EPA Victoria — Manage Asbestos Waste and Dispose of Asbestos Waste
  • EPA Victoria — Waste Levy and quarterly waste levy statements
  • EPA Victoria — Understand Your Waste Obligations and Duties
  • EPA Victoria — Waste Tracker (for reportable priority waste)
  • WorkSafe Victoria — Compliance Code: Demolition (Edition 2, 2019)
  • Asbestos.vic.gov.au — Packaging, Transport and Disposal of Asbestos